Tuen Mun Road Widening, Hong Kong
Balfour Beatty
Evidencing and preparing a claim for negligence against the Design Engineer (E&Os), which resulted in the Design Engineer agreeing to settle the dispute before the Arbitration hearing.
Photo used on Creative Commons License.
YEAR
1999 – 2001
ROLE
Quantity Survey
PRINCIPLE ELEMENT
Road
DISPUTE TYPE
Arbitration
CONTRACT TYPE
Hybrid Lump Sum
LOCATION
Hong Kong
VALUE
HK$400m